We note that the new road construction has started again but were wondering whether the plans that are available on the Turkish Kalkan News site are the most up to date. The link for those that are interested is:
http://www.turkishlocalnews.com/portal/component/content/article/180-kalkan-town-plans/17976-kalkan-town-plansI have printed these plan off and joined them up and they show:
1. a secondary road running just below the new widened dual carriage road from Kalkan to Kisla
2. the only access from the secondary road on to the new dual carriageway to Kas for Kisla and Komurluk residents is via a new access/intersection halfway between Komurluk and the Kalkan town turnoff
3. a new road at a lower level that appears to be an extension of the road that starts at the Kalkan Beach Park in Kisla and presently goes into the Mahal beach club and is now shown continuing through the Patara Prince and onto Komurluk joining up with the existing steep Komurluk access road behind Villa Mavi Koy.
Interested to hear of residents comments and if there are any updates to these plans that were first published in May.
KK
Linkback: https://www.enjoykalkan.com/forum/index.php?topic=4604.0